As part of the project ”Sag 38.39, Allingvej Hvidovre”, tendered by HOFOR, NOROQ has delivered a storage sewer “box culverts” made of prefabricated box tunnel elements.

 

The storage sewer is intended for equalization and storage of rainwater as well as mixed rainwater and wastewater.

 

Location: DK-2650 Hvidovre

new storage sewer hvidovre.

Anker 1
Allingvej_2.jpg

key facts.

System Box Tunnel

Total Length 115,0 m

Clearance Height 2,45 m

Clearance Width 3,0 m