top of page

As part of the project “Bicycle Tunnel Gjesing Ringvej” tendered by Esbjerg Kommune, NOROQ has delivered and installed a square tunnel for pedestrians and cyclists under the road Gjesing Ringvej. The tunnel and the wing walls are designed and installed as prefabricated elements.
Special in this project is that one of the four wing walls has a maximal height of 5 m and a total length of 50 m.
Location: DK-6715 Esbjerg
bicycle tunnel
gjesing ringvej.
Anker 1

key facts.
System. Square Tunnel
Total Length. 90,3 m
Clearance Height. 3,0 m
Clearance Width. 4,0 m
bottom of page