top of page

bridge deck over kystbanen.
Anker 1
For the project "Stibroer over Kystbanen", tendered by the municipality of Hørsholm, NOROQ has supplied prefabricated concrete elements for the new bridge deck. The bridge leads the bicycles and pedestrians on both sides along Rungstedvej across the Kystbanen.
The new bridge deck consists of 6 prefabricated elements, 3 elements per road side.
Location: DK-2960 Rungsted Kyst

specifications.
System. Bridge deck
Total length. 2 x 31,2 m
Element width. 2,20 m
Deck thickness. 0,35-0,67 m
bottom of page