top of page

Anker 1
bridges hvinningdal &
skægkær bæk.
This Design & Build contract is a part of the stage 6620 Funder - Haarup, which is a part of Herning - Aarhus motorway.
The contract includes all works in regards to the landscape bridges:
-
Bridge Hvinningdal (The bridge is a five fields 125 m long in-situ cast structure with an everage span of 25 m and consists of 2 parallel bridges for the motorway)
-
Bridge over Skægkær Bæk (The bridge is a five fields 150 m long in-situ cast structure with an everage span of 25 m and consists of two parallel bridges for the motorway)
-
Bridge for new municipality road over Skægkær Bæk (The structure for Sejling Hedevej Vest is a 64 m long 2-fields insitu bridge
key facts.
Client. International Contractor
Value. DKK 120.000.000
Services. Tender Management,
Engineering, Quantity
Survey
Scope. Bridge Works, Infrastructure
Location. Denmark
Year. 2012