top of page
Tender Management, Engineering, Tilbudsudvikling, Rådgivning
Anker 1

E3001 ringsted-fehmarn banen,
road bridges lolland-falster
.

Between 2015 and 2021 Banedanmark will build a railway line connecting to the future Fehmarn Belt fixed link between Denmark and Germany.

 

The project includes an extra track alongside the existing track between Vordingborg and the southern part of Holeby, where the line connects to the fixed link across Fehmarn Belt. The line will be upgraded to a speed of 200 km/h for passenger trains.

 

The project, as a part of Ringsted–Fehmarn High Speed Railway is a Design & Build contract of 18 road bearing bridges in the geographic area of Lolland and Falster. The contract covers design and build of the bridges and roads, earth works and demolition of existing bridges.

key facts.

Client       International Contractor

Value        DKK 280.000.000

Services   Tender Management,

                      Engineering, Quantity
                      Survey

Scope       Bridge Works, Road Works

Location.   Denmark

Year          2013

bottom of page