top of page

faunapassage in
faaborg.
Anker 1
As part of the project ”Udskiftning af bro 233”, announced by Faaborg-Midtfyn Municipality, NOROQ has delivered and installed a prefabricated fauna passage as a square tunnel.
Bridge 233 is a fauna passage that leads Hagerup Å beneath Krarup Nordegn.
Location: DK-5750 Ringe

specifications.
System. Square tunnel
Total length. 7,5 m
Clearance height. 1,8 m
Clearance width. 4,5 m
bottom of page