Anker 1
As part of the project “Replacement of Bridge at Ejby Å” tendered by Lejre Kommune, NOROQ has delivered and installed 1 prefabricated arch tunnel. The tunnel has been designed and installed as an arch tunnel including wing walls.
In addition, NOROQ has delivered a concrete wall, which has to be installed at the inside of the tunnel that functions as a separation between the stream and a passage for small amphibians.
Location: DK-4060 Kirke Såby
key facts.
System. Arch Tunnel
Total Length. 19,0 m
Clearance Height. 2,3 m
Clearance Width. 2,9m