fauna passage

lejre.

Anker 1

As part of the project “Replacement of Bridge at Ejby Å” tendered by Lejre Kommune, NOROQ has delivered and installed 1 prefabricated arch tunnel.  The tunnel has been designed and installed as an arch tunnel including wing walls.

 

In addition, NOROQ has delivered a concrete wall, which has to be installed at the inside of the tunnel that functions as a separation between the stream and a passage for small amphibians.

Location: DK-4060 Kirke Såby

key facts.

System Arch Tunnel

Total Length 19,0 m

Clearance Height 2,3 m

Clearance Width 2,9m