top of page

bicycle and pedestrian
tunnel horsens.
As part of the project “Horsens Omfartsvej Syd”, announced by Horsens Kommune, NOROQ has delivered and installed two prefabricated tunnels.
Both tunnels have been designed as box tunnels incl. 4 wing walls with closed bottom. Both have been delivered with cast ACO-channel.
Location: DK-8700 Horsens
Anker 1

specifications.
UF af Omfartsvej
UF af Bjerrevej
System. Box Tunnel Box Tunnel
Total length. 14,0 m 24,5 m
Clearance height. 3,1 m 3,1 m
Clearance width. 4,0 m 4,0 m
bottom of page