top of page

tunnel bispebjerg hospital.
Anker 1
For the project "Bispebjerg Hospital and Ny Psykiatri Bispebjerg; Establishing a tunnel connection "NOROQ has supplied and assembles a prefabricated box tunnel as a connection between the buildings.
The tunnel connection was mounted in three days in a pit, which was stiffened by a digging box.
Location: DK-2400 Copenhagen

specifications.
System. Box tunnel
Total length. 64,45 m
Clearence height. 2,55 m
Clearance width. 3,00 m
bottom of page