top of page
bokstunnel, tunnel, noroq

steel tunnel

dalbyvej.

Anker 1

As part of the project ”Steel tunnel Dalbyvej”, tendered by Hedensted Municipality, NOROQ has delivered and installed a steel tunnel that is installed on an ins-situ cast concrete foundation.

Location: DK-8722 Hedensted

firkanttunnel, tunnel, noroq

specifications.

System Steel tunnel

Total length 36,8 m

Clearance height. 3,3 m

Clearance width 6,5 m

bottom of page