top of page
bokstunnel, tunnel, noroq

tunnel hatting.

Anker 1

As part of the project ”Horsens Forbindelsesvej”, tendered by Horsens Municipality, NOROQ has delivered and installed a square tunnel that is designed with prefabricated deck elements and wing walls, whereas the bottom and the side walls have been cast in-situ.

Location: DK-8700 Horsens

firkanttunnel, tunnel, noroq

specifications.

System Square tunnel

Total length 19,5 m

Clearance height. 3,2 m

Clearance width 8,5 m

bottom of page